PCI and final inspection

Posted by | Posted in Final Stage | Posted on 28-04-2011

So I have been neglecting this blog for a little bit (sorry about that, have been incredibly busy) but we had our PCI on the 14th of April and overall it went pretty well. Most of the issues found were pretty minor (scuff marks / paint chips that need to be touched up and the like, doors realigned etc), but some major things hadn’t been done yet (fencing and letterbox).

Then we had the Easter break which really just caused two “broken” weeks in succession to occur, so it’s hard to get any work done over those two weeks. I have been in touch with my contract liaison since, however, and the good news is that we have a final handover date of the 10th of May. We will need to meet up on site and go through the things that were found at PCI to check that they have been resolved satisfactorily, and then it’s off to Altona to hand over the bank cheque and get the keys!

Comments are closed.