Plans signed off.
Posted by Planning | Posted on 13-08-2010
| Posted inWe have the plans signed off – one step away from the finalised plans. Burbank did soil tests but they haven’t gotten back to us with the final plans that detail slab information. To speed up the process a bit we signed off on the draft for everything else – Burbank made some minor mistakes in Bedroom 1 and we got a chance to add in some minor things that we forgot at our colour appointment (tiled skirtings, some exterior lighting, extra power point).