Bricks Pt 2
Posted by Structure | Posted on 16-01-2011
| Posted inOkay so it’s been quite a while since I’ve posted on our blog. Naturally there was some time off for everyone (including the hard working tradies) so there wasn’t much activity happening with our build, but soon into January they started up again. I luckily had 2 weeks off starting from Christmas, so I visited the build near the end of my holiday on a weekday and found the brickies at work. I waved hello to them and they waved back but were on their lunch break and didn’t seem interested to come out and have a chat, so I just took some happy snaps and then drove away.
The house is really coming along now – we just went there earlier today and it seems 90% of the bricking has been done. Burbank jackhammered the front corner of the slab just before Christmas, (after saying that they weren’t going to – a note of contention) but the concreter left some exposed reo and left it like that for the whole 2 weeks of holiday time, which is great (*sarcasm*). When we went there earlier today the concreter had finally patched up the front but we’re pretty sure that none of the small section of exposed reo at the back has been patched up (behind Bed 3). It is now submerged under the soil, and I’m going to email my liaison tomorrow about it. Some bricking left to do is the front garage, the side wall (front half), front Bed 1 where they jackhammered the slab, and the angled brick for under the windows. After that – lockup!